Segment 21 Live and Ready for Installation Scheduling

More good news as the build-out of the Roanoke Connect fiber optic network continues. Segment 21 is the latest piece of the Roanoke Connect system to become operational, and installation scheduling to bring broadband Internet and Smart Grid services to subscribers is under way.

Segment 21 consists of Hart Swamp Rd., Hwy 308 and Blake Dr., all in Rich Square.

Meanwhile, development of Segment 25 – one of the largest system segments – is significantly advanced and nearing completion.

With cold weather upon us, the energy savings achievable through the Roanoke Connect technology now can be maximized by subscribers benefiting from their ecobee smart thermostats and water heater thermostat control devices. 

Stay warm and save money, and let Roanoke Connect help you do it.